00 / 08Exit tour

Design a fund that holds together.

Eight short stops through fund architecture: portfolio construction, firm design, the plan of record and, on Practice, up to ten funds on one firm record. Each stop says which plan includes it, starting with what you can do free.

8 stops · About five minutesStarts with the Free planOne fund or ten

Your LP update, next.

The last three stops show the quarterly LP update Architecture drafts, the model diagnostics and the methodology behind every reading. Tell us a little about your firm to continue.

Step 01·Portfolio constructionFree plan

Start with portfolio construction.

Every fund's architecture starts here: fund size, reserves, planned companies, target ownership and the size of the team. Architecture works out the planned initial check and partner load, then places each reading beside public fund data or a published design rule, with the source named on the card.

On every plan
The portfolio construction check is part of the Free plan, with no card required. It is the same check paid plans run for each of their funds, up to ten.
01Sourced, not scored.Every reading names its evidence tier and source.
02Ready for an LP.In range, above or below, with a plain-language note on why.

Illustrative workspace · example data

architecture.colibristrategies.com/dashboard/fund
Fund plan · Portfolio construction check
Example Fund I
Seed · $40M fund · 40% reserves · 2 partners
Planned initial checkIn range
$0.92MBand $0.5M to $5M
Principled · Design rule anchored on Crain (2017) and Amore et al. (2023)
Target ownership at entryIn range
10%Band 7% to 20%
Principled · Design rule anchored on Gompers et al. (2016)
Planned companiesIn range
26Norm 20 to 30
Principled · Practitioner norm (Austin and Thurston 2020)
New companies per partner per yearAbove
3.25Published 0.84
Published · Cumming (2006)
Step 02·Firm designAll plans

Design the firm around the fund.

Portfolio construction is only half of a fund's architecture. The other half is the firm that has to carry it: lifecycle stage, decision process, board load, team capacity, partnership dynamics, support platform and succession. Edit any lever and the rest of the platform updates. Eleven design checks recalculate from your saved inputs and flag choices that may be pulling in different directions.

On every plan
Firm design is part of every plan, including Free. The same eleven-check engine runs for a single fund on Free or Foundation and for up to ten funds on Practice. The plans differ in how many funds it runs against, not in how deep the analysis goes.
01See it move.Readings update as you adjust each lever, before you save.
02Named tensions.Each surfaced item names the variables in conflict.

Illustrative workspace · example data

architecture.colibristrategies.com/dashboard/fund-design
Fund Design · Configuration levers
Colibrí Ventures Fund IV
Series A-Focused · $400M Fund · 2024 Vintage
Investment Thesis02
Stage focus
Pre-seedSeedSeries AMulti-stageBroad
Industry scope
DeepFocusedThematicBroadGeneralist
Portfolio Construction03
$400M
20
15%
40%
Live Congruence ScoreModerately congruent
85/100
AlignedIC structure and industry scope. Voting model aligns with sector scope.
SoftStage focus and ownership. Ownership target sits just outside the expected band.
AlignedBoard seats and team capacity. Commitments fit team capacity at 1.7 seats per professional.
SoftLifecycle and succession. Succession work expected to have begun at this stage.
Step 03·Plan versus actualFree plan

Keep the plan of record.

When the plan is right, lock it, ideally at first close. As investments go in, Architecture compares the portfolio you are building with the plan you locked: companies, average initial check, entry ownership, reserves and entry stage. If the plan changes, revise it with a note, and the earlier version stays on the record.

On every plan
Locking a plan and tracking it is part of the Free plan. It is the record that lets you tell an LP, with evidence, that Fund I did what you said it would.
01Nothing silently overwritten.Each revision keeps the version before it and your reason.
02Grows with the portfolio.The comparison updates every time you add an investment.

Illustrative workspace · example data

architecture.colibristrategies.com/dashboard/fund
Fund plan · Locked plan versus actual
Plan locked Q1
Version 1 · Locked at first close
MeasurePlanActualStatus
Companies2612 so farOn plan
Average initial check$0.92M$0.95MOn plan
Entry ownership10%9.6%On plan
Reserves40%42%+2 pts
Entry stageSeedSeedOn plan
Step 04·Decision supportAll plans

Every investment, evaluated against your configuration.

When you add an investment, the platform shows you how that one decision moves your portfolio before you commit to it. Stage discipline, sector spread, breadth, deployment pace, and check size relative to your benchmark all update as you type. It reads from the same configuration you set in Fund Design, so the analysis is consistent with everything else in the platform.

On every plan
Decision support runs on every investment you add, including on Free. With one fund you see how a new deal moves that portfolio. On Practice you also see how it changes the firm's total exposure if you have backed the company in another fund.
01Before commitment.The panel updates as you enter the investment, not after.
02Thesis stretch surfaced.The platform names when a deal sits outside the declared thesis.

Illustrative workspace · example data

architecture.colibristrategies.com/add-investment
New record · Configuration-aware
Add investment
The Decision Support panel shows how this investment moves the portfolio.
Concord AI
AI/ML
Pre-seedSeedSeries ASeries BLater
$5M
$1.5M
8%
Decision Support · Live impact
Portfolio breadth6 / 20→7 / 20
Sector spread2→3
Stage discipline83% A→71% A
Deployment12%→13%
Modest thesis stretch
Seed investment falls outside the stated Series A focus. Adds AI/ML as a new sector. Check size $1.5M sits well below the benchmark check of $12.0M for this fund.
Step 05·Follow-on decisionsFoundation + Practice

Bring structure to your next follow-on.

For each active position, the scenario engine asks one question: which positions deserve a closer look, at what check size, and when? It returns an Outlier Probability Score (a model score that summarizes company signals, not a calibrated probability of an outcome), a suggested check size as a share of your pro-rata, a timing signal, and a three-part rationale. The recommendation curve uses assumptions for your lifecycle: Conviction firms use a steeper model curve; Cadence firms use a flatter curve that favors measured diversification.

How the tiers differ here
Foundation ranks every active position in your one fund. Practice ranks positions across every fund in the firm, so the highest-conviction position in Fund III sits next to the highest-conviction position in Fund II. This matters when reserves are scarce and you need to put them behind the strongest signal, no matter which fund holds the position.
01Pro-rata as the anchor.Every recommendation is expressed as a share of your pro-rata, so the math is auditable.
02Reserve and concentration aware.Recommendations respect what is left in your reserve pool and your firm-level exposure limits.

Illustrative workspace · example data

architecture.colibristrategies.com/dashboard/scenarios
Scenario Engine · Follow-on analysis
Scenarios
Follow-on candidates across the firm, ranked by Outlier Probability Score.

Scroll the comparison sideways to see all columns.

Company · FundMOICOPSRecommendation
Brassroot
Fund II · Active
7.00×92Yes · 1.4× pro-rata
Marsh
Fund II · Active
6.00×85Yes · 1.2× pro-rata
Halden
Fund III · Active
4.50×72Selective · 0.8× capped
Cobble
Fund I · Partial exit
2.50×54Wait · milestone
Bramble
Fund I · Active
1.30×28No · capital better elsewhere
Step 06·LP reportingFoundation + Practice

A first draft of your LP update.

Generate a draft quarterly memo when you are ready to review the fund with your LPs. Architecture uses saved fund data and model results to prepare the first draft. Check the figures, add the context only your team knows, and review the wording before sharing.

How the plans differ here
Foundation and Practice both draft a quarterly LP update. Foundation covers your one fund; Practice covers the funds in your firm. The Free plan keeps the design and plan you will report against.
01Start with your saved data.The draft draws from the fund data behind your dashboard.
02Review before sharing.Use the draft as a starting point, then export the version you have reviewed.

Illustrative workspace · example data

architecture.colibristrategies.com/dashboard/funds/iv/memo
Illustrative quarterly memo · Q2 2026
Colibrí Ventures Fund IV
Portfolio and firm design analysis · Six months in fund · 12% of capital deployed

Fund IV closed its second full quarter of deployment with six initial investments totaling $49 million against the $400 million commitment. Stage discipline remained intact across the period, with approximately 83 percent of capital deployed at Series A, consistent with the stated thesis. The portfolio added one new sector position in the period and now reads as a three-sector focused mandate.

Against the plan locked at first close, the fund has made six of twenty planned investments at an average initial check within 5 percent of plan, and reserves stand at 41 percent against a planned 40. This example shows the format; it is not a live fund or a benchmark.

On plan
Versus locked plan
$49M
Deployed
6 / 20
Portcos
Step 07·Across your fundsPractice, up to ten funds

One firm, up to ten funds.

Fund architecture does not stop at Fund I. Practice holds up to ten funds on one firm record, each with its own design and plan of record, and reads them together: where sector and company exposure accumulates across funds, and how the firm's three model diagnostics (Portfolio Efficiency, Firm Design Congruence and Cross-Fund Concentration) combine in the Architecture Score. They describe how a firm is built. They are not a rating and they do not forecast returns.

How the plans differ here
Portfolio Efficiency and Firm Design Congruence run for every fund on every plan. Practice adds up to ten funds, Cross-Fund Concentration and the composite Architecture Score, which only make sense once a firm runs more than one fund.
01Engine 1.Portfolio Efficiency. How the fund's capital math fits its stage and lifecycle.
02Engine 2.Firm Design Congruence. Whether your structural choices fit together.
03Engine 3.Cross-Fund Concentration. Where the firm's capital is concentrated across funds.
04Composite, on Practice.The Architecture Score brings the three together, and a weak area pulls it down by construction.

Illustrative workspace · example data

architecture.colibristrategies.com/dashboard/architecture
Architecture · Firm analytical view
Architecture
Colibrí Ventures · Fund IV · 2024 Vintage
89 /100
Cadence · New
0Provisional median 58Provisional top quartile 73100
Engine 1
Portfolio Efficiency
87/100
5 subscores
Engine 2
Firm Design Congruence
85/100
11 checks, 3 soft
Engine 3
Cross-Fund Concentration
95/100
1 soft flag
Step 08·MethodologyAll plans

Understand what each number means.

The methodology explains each portfolio construction reading, the diagnostics and the scenario assumptions, and says which numbers are measured from public data and which are design rules. Use it to answer an LP's “where does this come from?” with a source.

On every plan
The methodology is the same on every plan. It explains where each benchmark comes from, which readings are design rules, and which sections apply to your plan.
01Published thresholds.Every band, weight, and threshold is documented and versioned.
02Calibration governance.Updates to the framework follow a documented review process, never quietly.

Illustrative workspace · example data

architecture.colibristrategies.com/methodology
Illustrative methodology reference

Colibrí Architecture

IFoundationsConceptual framework
IIData ArchitectureSchema
IIIEngine 1 · Portfolio EfficiencyFoundation + Practice
IVEngine 2 · Firm Design CongruenceFoundation + Practice
VEngine 3 · Cross-Fund ConcentrationPractice
VIThe Architecture ScorePractice
VIIThe Temporal LayerFoundation + Practice
VIIICalibration GovernanceVersioning rules
IXScenario EngineFoundation + Practice
End of tour · Choose where to start

Start free, add more when you need it.

The Free plan covers one fund's portfolio construction, firm design, locked plan and decision support, with no card and no expiry. Foundation adds follow-on decisions, LP updates and next-fund readiness for a single fund. Practice brings up to ten funds together. The methodology is the same on every plan.

Design one fund on the Free plan. No card required.Design one fund free →
One fund
Foundation
For partnerships running a single fund who want the decisions and reporting on top of the plan.
  • Everything on Free.Portfolio construction and firm design checks, a locked plan versus actual, and decision support.
  • Follow-on decisions.The Scenario Engine suggests a check size and timing signal for each active position.
  • Quarterly LP update.A first draft from your saved fund data, for you to review before sharing.
  • Next-fund readiness.The Outcome Profile and next-fund timing, read from public data.
  • Two team seats.Work on the same fund record with a partner.
Every reading sourced. Public fund data or a named design rule.Eleven firm-design checks. Recalculated from saved inputs.Firm-level access. Workspaces are limited to authorized members.